Table of
Contents
2......... Environmental Monitoring and Audit
3......... implementation status on the
environmental protection requirements
List of
Tables
Table
1.1 Summary
of Awarded Works Contracts
Table 2.1 Summary of Major Construction
Activities in the Reporting Period
Table 2.2 Summary of 24-Hour TSP Monitoring
Results in the Reporting Period
Table 2.3 Summary of Construction Noise
Monitoring Results in the Reporting Period
Table 3.1 Summary of Status of Required
Submissions for and EP-438/2012/K
Table 3.2 Summary of Status of Required
Submissions for EP-437/2012
List of
Appendices
Appendix B 56th Monthly
EM&A Report for Works Contract 1111 – Hung Hom North Approach Tunnels
Appendix C 55th Monthly
EM&A Report for Works Contract 1103 – Hin Keng to Diamond Hill Tunnels
Appendix D 54th Monthly EM&A Report for Works Contract
1106 – Diamond Hill Station
Appendix E 52nd Monthly EM&A Report for Works Contract
1107 – Diamond Hill to Kai Tak
Tunnels
Appendix F 51st Monthly EM&A Report for Works Contract
1112 – Hung Hom Station and Stabling Sidings
Appendix G 51st Monthly EM&A Report for Works Contract
1108 – Kai Tak Station and Associated Tunnels
Table
1.1 Summary
of Awarded Works Contracts
Works
Contract |
Description |
Construction
Start Date |
Contractor |
Environmental
Team |
1101(1) |
Ma
On Shan Line Modification Works |
December 2012 |
Sun
Fook Kong Joint Venture (SFKJV) |
ANewR Consulting Ltd. (ANewR) |
1102 |
Hin Keng Station
and Approach Structures |
October 2013 |
Penta-Ocean
Construction Co. Ltd. |
Cinotech Consultants Ltd. (Cinotech) |
1103 |
Hin Keng to
Diamond Hill Tunnels |
February 2013 |
Vinci
Construction Grands Projets |
Ove
Arup & Partners Hong Kong Ltd. (Arup) |
1106 |
Diamond
Hill Station |
March 2013 |
Leader
Joint Venture |
Cinotech Consultants Ltd. (Cinotech) |
1107 |
Diamond
Hill to Kai Tak Tunnels |
May 2013 |
Chun
Wo - SELI Joint Venture |
Cinotech Consultants Ltd. (Cinotech) |
1108 |
Kai
Tak Station and Associated Tunnels |
June 2013 |
Kaden
-Chun Wo Joint Venture |
Environmental
Pioneers & Solutions Ltd. |
1108A(2) |
Kai
Tak Barging Point Facilities |
September 2012 |
Concentric
– Hong Kong River Joint Venture (CCL-HKR JV) |
Cinotech Consultants Ltd. (Cinotech) |
1109 |
Stations
and Tunnels of Kowloon City Section |
September 2012 |
Samsung-Hsin Chong JV (SSHCJV) |
ERM-Hong
Kong Limited (ERM) |
1111 |
Hung Hom North Approach
Tunnels |
January 2013 |
Gammon-Kaden SCL1111 JV |
AECOM Asia Co. Ltd. |
1112 |
Hung
Hom Station and Stabling Sidings |
June 2013 |
Leighton
Contractors (Asia) Limited |
SMEC Asia Ltd., HK |
Notes:
(1)
All construction
works (works
areas at Tai Wai Mei Tin Road and the offsite temporary storage areas) under Works
Contract 1101 were completed on 29 February 2016.
(2)
All construction
works (Kai Tak Barging Point Facilities) under Works Contract
1108A were completed on 29 September 2016.
Works Contract |
Contract Title |
Works Covered in Environmental Permit No. |
1101 |
Ma On
Shan Modification Works |
|
1102 |
Hin Keng
Station and Approach Structures |
|
1103 |
Hin Keng
to Diamond Hill Tunnels |
|
1106 |
Diamond
Hill Station |
|
1107 |
Diamond
Hill to Kai Tak Tunnels |
|
1108 |
Kai Tak Station and Associated Tunnels |
|
1108A |
Kai Tak Barging Point Facilities |
|
1109 |
Stations and Tunnels of Kowloon
City Section |
|
1111 |
Hung Hom North Approach Tunnels |
EP-437/2012
& EP-438/2012/K |
1112 |
Hung Hom Station and Stabling Sidings |
Table 2.1 Summary of Major Construction
Activities in the Reporting Period
Works Contract |
Site |
Construction Activities |
1102 |
Hin
Keng Station and Approach Structures |
·
Soft
landscaping; ·
ABWF
works at Hin Keng
Station; ·
Modification
of retaining wall and installation of noise barrier; ·
Hard
landscape; ·
E&M
works; and ·
Backfilling
works |
1103 |
Hin
Keng Area |
·
Site formation |
Fung Tak Area |
·
ELS works and ABWF works |
|
Ma Chai
Hang Area |
·
C&S works and ABWF works |
|
Shui
Chuen O |
·
Storage area |
|
1106 |
Diamond
Hill Station Area |
·
Superstructure works of SCL-DIH station; ·
ABWF works at SCL-DIH station area; ·
Foundation works, temporary Lung Cheung Road
diversion, TTA for site access; ·
and temporary footpath diversion at Choi Hung
Road; ·
Construct column & wall, bulk head wall and
backfilling at Lung Cheung Road; ·
Construct columns, walls, beams and slabs at MOE
near Entrance B; ·
Shoring modification and re-propping, construct
protective walkway and base slab at
Entrance A2; and ·
Drainage works |
1107 |
Tunnel
section next to Kai Tak Station |
·
General
reinstatement works |
1108 |
Kai Tak Station |
·
Open cut tunnel: UT general cleaning and defect
rectification. ·
Cut and cover tunnel: UT general cleaning and
defect rectification, concrete casting at downtrack
access shaft and waterproofing works. ·
Station: Drainage work at all area, leveling to
F.F.L. in Area 3, installation of roof cladding and reflected ceiling at
Entrance A, B & D, EVA construction, installation of aluminum fins at NVS
and SVS, installation of glass canopy at DEE and SEE, and installation of
metal screen wall at DEE and SEE. |
1109 |
Ma Tau
Wai (MTW) Works Area |
·
Along
Ma Tau Wai Road and TKW/MTW Road Garden – Station construction; ABWF works;
and EEP construction. |
To Kwa Wan
(TKW) Works Area |
·
Olympic Garden – Construction of station entrance
and new Pier 46; ·
TKW Station –
Construction of TKW station, and backfilling; ·
Tam Kung Road – Adit construction; and ·
Nam Kok Road –
Construction of station entrance. |
|
1111 |
Mong Kok Freight Terminal (1) |
·
All construction activities were completed in May
2015 |
Ho
Man Tin |
·
Hoarding removal |
|
NSL 3 -
8 |
·
Concreting works, form work erection,
reinforcement fixing, backfill, road & drainage construction, excavation,
pipe laying, hoarding removal |
|
OB2 |
·
TB1 dismantling, trench excavation for watermain laying, TB1 abutment removal, abandoned watermain removal |
|
OB2A |
·
Road diversion, steel deck dismantling |
|
NSL 9
& Oi Sen Path |
·
Backfilling, drainage work, scaffolding platform erection,
dismantling of scaffolding, lifting works, hoarding removal, dismantle
elevated walkway |
|
EWL 7 –
9(1) |
·
All construction activities were completed in Jun
2017 |
|
1112 |
Hong Hom (HUH and HHS) Works Area |
·
Building services works at SAT ·
EVA roadworks at SAT ·
Utility and drainage works at SAT ·
Demolition works of bulkhead door adjacent to
existing West Rail Stub Tunnel at SAT ·
Construction of tunnel structure at HUH, NAT ·
Drainage works at HHS ·
Platform ABWF and E&M works at HUH ·
Utility works at NAT ·
Modification works at Concourse level, mid-level
walkway |
Note:
(1)
Construction works were completed.
Table
2.2 Summary of 24-Hour TSP Monitoring Results in the
Reporting Period
Monitoring Station ID |
Location |
TSP Concentration (mg/m3) |
Action Level (mg/m3) |
Limit Level (mg/m3) |
Exceedance due to the Project
Construction (Yes/No) |
Works
Contract 1102 and 1103 |
|
|
|
|
|
DMS-1 |
C.U.H.K.A.A.
Thomas Cheung School |
21.0
– 53.8 |
148.7 |
260 |
No |
Works
Contract 1103 |
|
|
|
|
|
DMS-2 |
Price
Memorial Catholic Primary School |
22.3 – 56.7 |
167.4 |
260 |
No |
Works
Contracts 1103 and 1106 |
|
|
|
|
|
DMS-3 |
Hong
Kong S.K.H Nursing Home (1) |
23.3-52.1 |
159.1 |
260 |
No |
Works
Contract 1106 and 1107 |
|
|
|
|
|
DMS-4 |
Block
1, Rhythm Garden |
16.6-50.2 |
160.4 |
260 |
No |
Works
Contract 1108 (5) |
|
|
|
|
|
Works
Contract 1109 |
|
|
|
|
|
DMS-6 |
Katherine Building (2) |
39-70 |
156.8 |
260 |
No |
DMS-7 |
Parc
22 (3) |
47-81 |
166.7 |
260 |
No |
DMS-8 |
SKH
Good Shepherd Primary School |
50-82 |
152.2 |
260 |
No |
DMS-9 |
No.
12 Pau Chung Street (4)(9) |
56-77 |
160.9 |
260 |
No |
DMS-10 |
Chat
Ma Mansion |
43-76 |
170.4 |
260 |
No |
Works Contract 1111 |
|
|
|
|
|
AM1(6) |
No.
234 – 238 Chatham Road North (7) |
18.1-41.7 |
183.9 |
260 |
No |
Works Contract 1112 |
|
|
|
|
|
AM2 |
Site
Boundary of Finger Pier Adjacent
To
Harbourfront Horizon (8) |
31.5 – 42.2 |
182 |
260 |
No |
Notes:
(1)
Alternative monitoring location to Shek On House
(2)
Alternative monitoring location to Prosperity
House
(3)
Alternative monitoring location to Skytower Tower 2
(4)
Alternative
monitoring location to Lucky Building
(5)
No TSP monitoring is required under this
contract
(6)
AM1 named as HUH-1-3 in SCL(TAW-HUH)
and SCL(HHS) EIA Reports.
(7)
Alternative monitoring location to Wing
Fung Building
(8)
Alternative monitoring location to Harbourfront Horizon
(9)
Alternative monitoring
location of No. 26 Kowloon City Road
Table 2.3 Summary of Construction Noise
Monitoring Results in the Reporting Period
Monitoring Station ID |
Location |
Noise Level (LAeq,30mins, dB(A)) |
Limit Level (dB(A)) |
Exceedance due to the Project
Construction (Yes/No) |
|||
Measured |
Baseline |
Corrected (7) |
|||||
Works Contract
1102 and 1103 |
|
|
|
|
|
||
NMS-CA-1 |
C.U.H.K.A.A.
Thomas Cheung School |
55.3-57.9 |
57.0 |
<
Baseline-50.9 |
70 (65
during examination period) |
No |
|
Works Contract
1103 |
|
|
|
|
|
||
NMS-CA-2 |
Price
Memorial Catholic Primary
School |
58.7-62.2 |
66.0 |
<
Baseline |
70 (65
during examination period) |
No |
|
Works Contracts
1103 and 1106 |
|
|
|
|
|
||
NMS-CA-3 |
Hong
Kong S.K.H Nursing
Home (1) |
70.0-73.1 |
73.0 |
<
Baseline-56.7 |
70 |
No |
|
Works Contract
1106 and 1107 |
|
|
|
|
|
||
NMS-CA-4 |
Block
1, Rhythm Garden (north-eastern façade) |
67.6-72.3 |
71.0 |
<
Baseline-66.4 |
75 |
No |
|
NMS-CA-5 |
Block
1, Rhythm Garden (northern façade)(2) |
65.5-71.9 |
74.0 |
<Baseline |
70 (65
during examination period) |
No |
|
Works Contract
1108 (6) |
|
|
|
|
|
||
Works Contract
1109 |
|
|
|
|
|
||
NMS-CA-6 |
No. 16-23 Nam Kok Road (3) |
61.9-63.1 |
76.1 |
< Baseline |
75 |
No |
|
NMS-CA-7 |
Skytower Tower
2 |
65.2-66.1 |
70.0 |
< Baseline |
75 |
No |
|
NMS-CA-8 |
SKH
Good Shepherd Primary
School |
71.0-71.6 |
75.4 |
< Baseline |
70 (65
during examination period) (79 during
the period of conducting the continuous noise monitoring) (8) |
No |
|
NMS-CA-9 |
Kong Yiu Mansion (4) |
68.0-68.9 |
69.2 |
< Baseline |
75 |
No |
|
NMS-CA-10 |
Chat Ma Mansion |
75.9-76.1 |
76.6 |
< Baseline |
75 |
No |
|
Works Contract
1111 |
|
|
|
|
|
||
NM1 |
Carmel
Secondary School (South
Block) |
64.1-67.3 |
68.0 |
< Baseline |
70 (65
during examination period) (68 during the period of conducting the
continuous noise monitoring) (9) |
No |
|
NM2 |
No.
234 – 238 Chatham Road North (5) |
70.0-74.1 |
79.0 |
< Baseline |
75 (77) (10) |
No |
|
Works Contract 1112
(6) |
|
|
|
|
|
||
Notes:
(1)
Alternative monitoring location to Shek On House.
(2)
Alternative monitoring location to Canossa
Primary School (San Po Kong).
(3)
Alternative monitoring location to
Prosperity House.
(4)
Alternative monitoring location to Lucky
Building.
(5)
Alternative monitoring location to Wing
Fung Building.
(6)
No construction noise monitoring is
required under this contract.
(7)
The measured noise levels are corrected
against the corresponding baseline noise levels.
(8)
The Limit Level of 79 dB(A) was updated on
22 Aug 2013 as per the latest Construction Noise Mitigation Measures Plan
(CNMMP) and Continuous Noise Monitoring Plan (CNMP) which were approved by EPD.
(9)
The Limit of 68
dB(A) was updated on 20 Jan 2014 as per the latest
CNMMP and CNMP which were approved by EPD.
(10)
Daytime noise
Limit Level of 77 dB(A) applies during the continuous
noise monitoring period.
Table 2.4 Log for Environmental Complaints,
Notification of Summons and Successful Prosecutions
for the Reporting Month
Works Contract |
Environmental Complaints |
Notification of Summons |
Successful Prosecutions |
1102 |
0 |
0 |
0 |
1103 |
1 |
0 |
0 |
1106 |
0 |
0 |
0 |
1107 |
0 |
0 |
0 |
1108 |
0 |
0 |
0 |
1109 |
1 |
0 |
0 |
1111 |
0 |
0 |
0 |
1112 |
0 |
0 |
0 |
Table 3.1 Summary
of Status of Required Submissions for and EP-438/2012/K
Submission |
Submission
date |
|
Condition 1.12 |
Notification
of Commencement Date of Construction of the Project |
1
Aug 2012 |
Condition 2.3 |
Notification
of Information of Community Liaison Groups |
13
Jul 2012 (1st submission) 31
Aug 2012 (2nd submission) 30
Nov 2012 (3rd submission) |
Condition 2.7 |
Management
Organisation of Main Construction Companies |
27
Jul 2012 (1st submission) 21
Aug 2012 (2nd submission) 19
Dec 2012 (3rd submission) 22
Jan 2013 (4th submission) 30
Apr 2013 (5th submission) 21
May 2013 (6th submission) |
Condition 2.8 |
Construction
Programme and EP Submission Schedule |
27
Jul 2012 |
Condition 2.9 |
Construction
Noise Mitigation Measures Plan (CNMMP) |
1
Aug 2012 (1st submission) 28
Sep 2012 (2nd submission) 30
Nov 2012 (3rd submission) 11
Jan 2013 (4th submission) 8
Feb 2013 (Approved) 26
Apr 2013 (6th submission) 11
Jun 2013 (7th submission) 12
July 2013 (Approved) 26
July 2013 (8th submission) 22
Aug 2013 (Approved) 23
Aug 2013 (9th submission) 13
Sept 2013 (Approved) 20
Jan 2014 (10th submission) 26 Feb 2014 (Approved) 31 Mar 2015 (Contract 1106 submission only) 13 Apr 2015 (Contract 1106 submission only) 15 Apr 2015 (Approved) |
Condition 2.10 |
Continuous
Noise Monitoring Plan (CNMP) |
1
Aug 2012 (1st submission) 28
Sep 2012 (2nd submission) 30
Nov 2012 (3rd submission) 11
Jan 2013 (4th submission) 8
Feb 2013 (Approved) 8
Feb 2013 (5th submission) 26
Apr 2013 (6th submission) 12
July 2013 (Approved) 26
July 2013 (8th submission) 22
Aug 2013 (Approved) 23
Aug 2013 (9th submission) 13
Sept 2013 (Approved) 20
Jan 2014 (10th submission) 26 Feb 2014 (Approved) 7 Oct 2014 (11th submission) 23 Oct 2014 (Approved) |
Condition 2.11 |
Construction
and Demolition Materials Management Plan (C&DMMP) |
6
Jul 2012 (1st submission) 12
Sep 2012 (2nd submission) 10
Oct 2012 (Approved) |
Condition 2.12 |
Sediment
Management Plan |
6
Jul 2012 (1st submission) 12
Sep 2012 (2nd submission) 5
Oct 2012 (3rd submission) 10
Oct 2012 (Approved) 4
Mar 2013 (4th submission) 9
May 2013 (5th submission) 24
July 2013 (6th submission) 26
July 2013 (Approved) |
Condition 2.13 |
Visual,
Landscape, Tree Planting & Tree Protection Plan |
6
Jul 2012 (1st submission) 30
Aug 2012 (2nd submission) 3
Oct 2012 (3rd submission) 13
Nov 2013 (Approved) 14
Nov 2012 (4th submission) 8
Feb 2013 (5th submission) 18
Mar 2013 (6th submission) 18
June 2013 (7th submission) 12
July 2013 (Approved) 23 Mar 2017 (8th submission) |
Condition 2.14 |
Transplantation
Proposal for Plant Species of Conservation Importance |
22
Aug 2012 (1st submission) 5
Oct 2012 (2nd submission) 26
Nov 2012 (3rd submission) 4
Dec 2012 (Approved) |
Condition 2.15 |
Conservation
Plan |
31
Jan 2013 (1st submission) 18
Mar 2013 (2nd submission) 24
Apr 2013 (Approved) |
Condition 2.16 |
Archaeological
Action Plan(s) (AAP(s)) for Works Contract 1109 |
10
Aug 2012 (1st submission) 3
Sep 2012 (2nd submission) 21
Sep 2012 (Approved) 11 Oct 2013 (3rd submission) 1
Nov 2013 (Approved) |
Condition 2.16 |
Archaeological
Action Plan(s) (AAP(s)) for Works Contract 1106 |
29
Jan 2013 (1st submission) 19
Mar 2013 (2nd submission) 8
Apr 2013 (Approved) |
Condition 2.23 |
Supplementary
Contamination Assessment Report for New Territories South Animal Centre |
28
Sep 2012 25
Oct 2012 (Approved) |
Condition 2.27 |
Operational
Ground-borne Noise Mitigation Measures Plan |
18 Mar 2016 (Batch 1 Version A submission) 28 Apr 2016 (Batch 1 Version B submission) 28 Apr 2016 (Batch 2 Version A submission) 1 Jun 2016 (Batch 1 Version C submission) 1 Jun 2016 (Batch 2 Version B submission) 23 Jun 2016 (Batch 1 Version D submission) 23 Jun 2016 (Batch 2 Version C submission) 15 Jul 2016 (Batch 1 Version D approved) 15 Jul 2016 (Batch 2 Version C approved) 15 Sep 2016 (Batch 3 Version A submission) 4 Oct 2016 (Batch 3 Version A approved) 8 Mar 2017 (Batch 4 Version A) 7 April 2017 (Batch 4 Version A approved) 7 June 2017 (Final) 20 July 2017 (Approved) |
Condition 2.28 |
As-built Drawings for Operational Ground-borne
Noise Mitigation Measures |
10 Aug 2017 (1st submission) |
Condition 2.30 |
As-built Drawings for Operational Air-borne Noise
Mitigation Measures |
4 Dec 2015 (1st
submission) 28 Dec 2015 (2nd submission) 4 Feb 2016 (Approved) |
Condition 2.33 |
As-built Drawings for Landscape and Visual
Mitigation Measures |
4 Dec 2015 (1st
submission) 28 Dec 2015 (2nd submission) 4 Feb 2016 (Approved) |
Condition
2.36 |
Contamination Assessment Plan (CAP) for the
Temporary Magazine Site at TKO Area 137 |
23 Mar 2016 (1st submission) 20 Apr 2016 (2nd submission) 22 Apr 2016 (Approved) |
Condition
2.36 |
Contamination Assessment Report (CAR) for the
Temporary Magazine Site at TKO Area 137 |
19 May 2016 (1st submission) 3 Jun 2016 (2nd submission) 15 Jun 2016 (Approved) |
Condition 3.1 |
Proposal for Termination of Environmental
Monitoring and Audit (EM&A) Programme for Kai Tak
Barging Point Facilities |
7 Oct 2016 (Approved) |
Condition 3.3 |
Baseline
Monitoring Report (Works Contract 1109 - Stations and Tunnels of Kowloon City
Section ) |
27
Jul 2012 |
Condition 3.3 |
Baseline
Monitoring Report (Works Contract 1108A – Kai Tak
Barging Point Facilities) |
31
Jul 2012 |
Condition 3.3 |
Baseline
Monitoring Report (Works Contracts 1103, 1106 and 1111 – Hin
Keng to Diamond Hill Tunnels, Diamond Hill Station,
and Hung Hom North Approach Tunnels) |
19
Oct 2012 |
Condition 3.4 |
Monthly
EM&A Reports No.
1-58 Monthly
EM&A Report No. 59 |
Reported in previous Monthly EM&A Reports 14 Aug 2017 |
Table
3.2 Summary of Status of Required
Submissions for EP-437/2012
EP Condition |
Submission |
Submission date |
Condition 1.11 |
Notification of Commencement
Date of Construction of the Project |
30 Nov 2012 |
Condition 2.3 |
Notification of
Information of Community Liaison Groups |
30 Nov 2012 |
Condition 2.5 |
Management
Organisation of Main Construction Companies |
19 Dec 2012 (1st
submission) 30 Apr 2013 (2nd
submission) |
Condition 2.6 |
Construction
Programme and EP Submission Schedule |
19 Dec 2012 |
Condition 2.7 |
Construction
Noise Mitigation Measures Plan (CNMMP) |
30 Nov 2012 (1st
submission) 8 Feb 2013
(Approved ) 26 Apr 2013 (2nd
submission) 11 Jun 2013 (3rd
submission) 27 Aug 2013
(Approved) 20 Jan 2014 (4th
submission) 28 Apr 2016 (Approved) |
Condition 2.8 |
Continuous Noise
Monitoring Plan (CNMP) |
30 Nov 2012 (1st
submission) 11 Jan 2013 (2nd
submission) 8 Feb 2013
(Approved) 20 Jan 2014 (3rd
submission) |
Condition 2.9 |
Construction and
Demolition Materials Management Plan (C&DMMP) |
6 Jul 2012 (1st
submission) 12 Sep 2012 (2nd
submission) 15 Oct 2012
(Approved) |
Condition 2.10 |
Sediment
Management Plan |
6 Jul 2012 (1st
submission) 12 Sep 2012 (2nd
submission) 5 Oct 2012 (3rd
submission) 15 Oct 2012
(Approved) |
Condition 2.11 |
Visual,
Landscape, Tree Planting & Tree Protection Plan (VLTTP) |
14 Nov 2012 (1st
submission) 8 Feb 2013 (2nd
submission) 4 Feb 2015 (3rd
submission) 26 Jun 2015 (4th submission) 12 May 2017 (5th submission) |
Condition 2.16 |
Operational
Ground-borne Noise Mitigation Measures Plan |
23 Mar 2017 (1st submission) 17 May 2017 (2nd submission) 28 Jun 2017 (3rd submission) 20 July 2017 (Approved) |
Condition 3.3 |
Baseline Monitoring
Report (Works Contracts 1103, 1106 and 1111 – Hin Keng to Diamond Hill Tunnels, Diamond Hill Station, and
Hung Hom North Approach Tunnels) |
19 Oct 2012 |
Condition 3.4 |
Monthly EM&A
Reports No. 5-58 Monthly EM&A
Report No. 59 |
Reported in previous Monthly EM&A Reports 14 Aug 2017 |